Define the baseline before revisions
Keep the accepted quotation, drawings, boundary-of-supply list and milestone schedule under one version number. Without a baseline, the team cannot distinguish a supplier obligation from a new customer request. Ask suppliers to reference drawing revisions and the original line item affected by each change.
Record impact beyond added price
A change may affect freight dimensions, installation access, electrical requirements, lead time, warranty or commissioning. Require a short impact summary and revised total before authorizing work. If a change affects engineered safety features, use qualified technical review rather than approval by a purchasing manager alone.
Assign owners and decisions
For each request, record who proposed it, the reason, cost, schedule effect, documents needing revision, status and approval authority. Mark rejected and deferred changes too. Verbal promises at a site meeting should be confirmed in writing before the order is altered.
Close the document loop at handover
Approved changes should appear in final drawings, parts lists, manuals and acceptance records. Otherwise the installed equipment may no longer match the original paperwork. A complete document set supports maintenance, insurer questions and future resale.
What to do next
- Freeze the original scope and drawing version
- Log price and schedule impact per change
- Require technical review for safety-related changes
- Identify approver and current status
- Update final documentation at handover
Common questions
Does every small change need a formal order?
Use a proportional process, but any change affecting scope, safety, price or delivery should be traceable.
Can I rely on a verbal change approval?
Written confirmation is more defensible and helps prevent misunderstandings.